CSA were engaged to unblocking a large SWD pipe in early June 2019. The Open channel drain had not been maintained for many years causing the 900mm diameter SWD pipe under the road to silt up and become 90% blocked. The drain could not flow to its full capacity causing flooding upstream of this pipe.




