Cranbourne has been on an infrastructural revolution. This roundabout removal project aims to improve access to employment, healthcare, and educational opportunities for the rapidly growing population in this region. For the latest developments and to stay informed about local works, residents and commuters are encouraged to sign up for email updates. CSA has been instrumental
A wet well primarily serves as a large containment system for wastewater, providing a temporary storage solution before its transfer to a treatment facility or another designated area. Due to various reasons such as system inefficiencies, significant rainfall, or regular maintenance tasks, water can accumulate in these wells. Addressing such a challenge, CSA embarked on
Bitumen tanks play a crucial role in various industries, serving as the lifeblood of construction projects and road infrastructure. These tanks hold and transport bitumen, a viscous material critical for asphalt production and road paving. Over time, bitumen tanks accumulate residue and impurities, reducing efficiency and potentially posing safety hazards. Here’s where on-site bitumen tank
When a diesel spill occurred at Docklands, it was essential to take swift action to mitigate any potential environmental hazards. CSA was immediately alerted and dispatched our team to the scene. Recognising the importance of a quick response, our crew wasted no time in mobilising all the necessary gear and personnel. Using specialised trucks and
A recent chemical spill originating from a factory posed a significant threat to the local environment, particularly the stormwater system and a nearby creek. In response, CSA immediately mobilised to contain and mitigate the spill’s impact. CSA demonstrated exceptional efforts in swiftly addressing the situation and taking proactive measures to safeguard the local waterways and
CSA was recently engaged to perform underground utility locating services and non-destructive hydro excavation at Mt Baw Baw for a new power station installation. Utilising cutting-edge equipment and extensive expertise, our operators identified and located existing underground utilities in the designated area. This critical step not only ensures the preservation of infrastructure but also facilitates
A Supply Vessel in Portland required the removal of sludge and sea wastewater. CSA Specialised Services, a leading provider of waste management and industrial cleaning services, were engaged to complete the task. To complete the job, CSA operators utilised four vacuum hoses, each around 40 meters in length. We also used two types of equipment,
CSA was engaged to assist in an ongoing maintenance project at Pakenham East rail depot. In the process of delivery, the project involved pits cleaning and the removal of groundwater. Two experienced operators were sent to the field along with a combination unit, an eductor truck, and a liquid tanker. The wastewater was transferred from
CSA Received an emergency call from Fire Rescue Victoria to pull down a building that was on fire and the firefighters were struggling to put it out. Our team was able to quickly remove the burning debris from the building, limiting potential damage and helping firefighters to fight the blaze more efficiently. We responded to
Residents in Melbourne’s southwest have been given an urgent warning after a lake was contaminated, killing hundreds of fish. The dead fish was discovered floating near the banks of Cherry Lake in Altona on Monday the 14th of March, and visitors to the famous walking spot were shocked to see it. The contamination is thought